That ceiling is a mess. They had to cut out all of the pipes and some existing structure to get this new beam in.
We had them span the new beam all the way back to the bearing wall behind the refrigerator.
That is the new pantry closet with drywall. There will be a full height flush wood door.
When I get back from Thanksgiving I think all of the drywall will be installed. Next they are going to start the built in shelves in the pantry and above the counter tops. Later in the week they will start to refinish all of the floors.
No comments:
Post a Comment