The contractors came to check things out and take some measurements. I had the masonry wall open and they were able to measure and order the steel. By the end of the day my back was soar but had made a lot of progress. Here are some shots from the day.
I started with the shelves
Then to the bathroom.
That piece being held up by the refrigerator probably weighs 500 pounds.
The old plaster just crumbles and the house is officially covered in dust.
Lauren helping with the cleanup.
This is the masonry wall that is coming out