Sunday, February 13, 2011

Framing Day 2

Add one more Home Depot trip to the total making that 24. Needed some more screws and more wood...

Framing day two was very productive. I had Billy Price here to help out and he did a great job framing in the doors. I'm about 85% done with the framing. There is a lot of small stuff left to do. Built in shelves for the bathroom. Lastly blocking to drop the ceiling a few inches below the joists for all the plumbing.

Completed utility closet. Toilet in the bottom left of the photo. Vent stack coming out of the slab in the wall.

Action shot with my new tool belt

Action shot... Billy became an expert at framing in doors.

Shower location.

Enclosed boiler.

Toilet will be in that back corner. The door to the addition will be enclosed eventually. Now I need to break open the wall where the wash machine currently is. Hopefully next week I'll be able to move the washer and sink then will be able to cut pass through in wall.