Today they put the refrigerator, range, garbage disposal and most of the cabinet doors on. They also finished the tile and hooked up the hood. There are still a lot of small details left to do but they seem pretty confident it will get finished. Right now things are a mess but under all the stuff you can see how good it is looking. I can't stop standing in the space and staring at it all.
They are going to install the cabients over top of the refrigerator tomorrow.
The new stone piece came this morning. It looks great. No seam and it matches!
The sink now works and that little button is the "air switch" for the garbage disposal. No need for a switch on the wall.
The bottom of the cabinets and bottom of the hood all align with grout lines. It all worked out really well.
No comments:
Post a Comment